06/02/2025 - Construction of the new Blandford Waste Management Centre ref: 4616    Recommendations Approved

The project is for Construction of a Waste Management Centre to the northeast of Blandford Forum, Dorset, to provide a Household Recycling Centre and Waste Transfer Station with access off the A350.  The current WTS in Blandford is an adapted grain store which forms part of a combined site adjacent to the HRC. The site is small and is in poor condition offering little scope for improvements in processing efficiency and landfill disposal diversion. The Blandford Waste Management Centre is being project managed by Assets and Property on behalf of Dorset Council’s waste services.

The need for a replacement WMC in the Blandford area was identified by Dorset Council’s Waste Services (formally the Dorset Waste Partnership) and several sites were put forward for consideration as part of the Bournemouth, Christchurch, Poole and Dorset Waste Plan 2019. 

 

Cabinet – 28 January 2025

Tender & Procure approval – Decision

1. That Cabinet approve the award of a contract to construct and develop a new waste management centre at Blandford, using Dorset Highways Works Term Service Contract within the approved capital funding.

 

2. That Authority be delegated to the Executive Director for Place in consultation with the Cabinet Member for Place Services and the Section 151 Officer to agree the contract terms.

 

 

Decision Maker: Executive Director, Place

Decision published: 11/02/2025

Effective from: 06/02/2025

Decision:

To approve the appointment Heidelberg Materials as the main contractor for the construction of a new Blandford Waste Management Centre.

 

·       For Phase 1 Highways Works element only

Phase 2 Main Works to follow once pricing exercise has been completed.


06/02/2025 - Wessex Water, 06 February 2025 until 07 February 2025 – WINTERS LANE, WADDON between the entrance to Little Waddon Vineyard and Backwoods. ref: 4612    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 10/02/2025

Effective from: 06/02/2025

Decision:

Decision:

 

 

 

Approved

 

 

 

Wessex Water, 06 February 2025 until 07 February 2025 – WINTERS LANE, WADDON between the entrance to Little Waddon Vineyard and Backwoods.

 

 

 

This Notice will enable Wessex Water safe access to carry out emergency works to replace leaking tap. 

 

 

 

Emergency works therefore no consultation carried out.

Lead officer: Officer Delegated Decision


06/02/2025 - Openreach 20 February 2025 between 0830 and 1530 – UNNAMED ROAD, WYNFORD EAGLE between the entrance to Eggardon Hill Farm and Higher Wynford Farm. ref: 4601    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 06/02/2025

Effective from: 06/02/2025

Decision:

Decision:

 

 

 

Approved

 

 

 

Openreach 20 February 2025 between 0830 and 1530 – UNNAMED ROAD, WYNFORD EAGLE between the entrance to Eggardon Hill Farm and Higher Wynford Farm.

 

 

 

This Notice will enable Openreach safe access to carry out pole replacement. 

 

 

 

Consultation period: 06 January 2025 – 05 February 2025

 

 

 

 

 

Following consultation, no comments received.

Lead officer: Officer Delegated Decision


27/11/2024 - Dorset Council 09 December 2024 until 12 December 2024 between 0900 and 1600 – B3163, BEAMINSTER between its junction with A3066 and its junction with A356. ref: 4600    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 06/02/2025

Effective from: 27/11/2024

Decision:

Decision: 

 

Approved 

 

Dorset Council 09 December 2024 until 12 December 2024 between 0900 and 1600 – B3163, BEAMINSTER between its junction with A3066 and its junction with A356. 

 

This Notice will enable Dorset Council to carry out carriageway resurfacing works and for National Grid to work in collaboration. 

 

Consultation not carried out by Traffic Team.

Lead officer: Officer Delegated Decision


05/02/2025 - Dorset Council, 17 February 2025 until 21 February 2025 – A3066, Beaminster between its junction with Buckham Down Road and a point approximately 270 metres south (Beaminster Tunnel). ref: 4598    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 05/02/2025

Effective from: 05/02/2025

Decision:

Decision: 

 

Approved 

 

Dorset Council, 17 February 2025 until 21 February 2025 – A3066, Beaminster between its junction with Buckham Down Road and a point approximately 270 metres south (Beaminster Tunnel). 

 

This Notice will enable Dorset Council to carry out carriageway maintenance. 

 

Consultation not carried out by Traffic Team.

Lead officer: Officer Delegated Decision


05/02/2025 - Wessex Water 17 February 2025 until 21 February 2025 – LONGFORD ROAD, THORNFORD between number 435 and the New House. ref: 4597    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 05/02/2025

Effective from: 05/02/2025

Decision:

Decision:

 

 

 

Approved

 

 

 

Wessex Water 17 February 2025 until 21 February 2025 – LONGFORD ROAD, THORNFORD between number 435 and the New House.

 

 

 

This Notice will enable Wessex Water safe access to carry out a service disconnection.

 

 

 

Consultation period: 24 December 2024 – 02 February 2025.

 

 

 

Following consultation, no comments received.

Lead officer: Officer Delegated Decision


05/02/2025 - Dorset Council, 19 – 21 February 2025 between 09:30 – 15:30 – B3075, Spetisbury as indicated by signage on site. ref: 4593    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 05/02/2025

Effective from: 05/02/2025

Decision:

Decision: 

 

Approved 

 

Dorset Council, 19 – 21 February 2025 between 09:30 – 15:30 – B3075, Spetisbury as indicated by signage on site. 

 

This Notice will enable Dorset Council to carry out carriageway maintenance and resurfacing works. 

 

Consultation not carried out by the Traffic Team.

Lead officer: Officer Delegated Decision


04/02/2025 - CAMBRIDGE ROAD, WEYMOUTH - 17 February 2025 until 17 April 2025. ref: 4592    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 04/02/2025

Effective from: 04/02/2025

Decision:

Decision:

CAMBRIDGE ROAD, WEYMOUTH - 17 February 2025 until 17 April 2025

This Notice will enable SGN to upgrade gas main.

Consultation period: 19/12/2024 - 20/01/2025

Following consultation, comments - no comments received

(Decisions included can be executive or non-executive in nature, depending on the delegation given.

Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the

Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


04/02/2025 - GAS HOUSE HILL, SHERBORNE LEVEL CROSSING - 22nd February 2025 until 23rd February 2025. ref: 4591    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 04/02/2025

Effective from: 04/02/2025

Decision:

Decision: Approved

GAS HOUSE HILL, SHERBORNE LEVEL CROSSING - 22nd February 2025 until 23rd February 2025.

This Notice will enable Network Rail Infrastructure Ltd safe access to enable removal of level crossing so

that rails through the crossing can be replaced

Consultation period: 12th December 2024 to 23rd January 2025.

Following consultation, no comments received.

(Decisions included can be executive or non-executive in nature, depending on the delegation given.

Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the

Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


03/02/2025 - High Street, Swanage - 17th February 2025 until 3rd May 2025. ref: 4583    Recommendations Approved

High Street, Swanage - 17th February 2025 until 3rd May 2025.

This Order will provide SGN with a safe storage compound in connection with their works scheduled

on A351 High Street.

Consultation period: 23rd October 2024 to 27th November 2024.

Following consultation, no comments received.

(Decisions included can be executive or non-executive in nature, depending on the delegation given.

Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the

Scheme of Delegation in the Council’s Constitution.)

Decision Maker: Officer Delegated Decision

Decision published: 03/02/2025

Effective from: 03/02/2025

Decision:

Decision: Approved

High Street, Swanage - 17th February 2025 until 3rd May 2025.

This Order will provide SGN with a safe storage compound in connection with their works scheduled

on A351 High Street.

Consultation period: 23rd October 2024 to 27th November 2024.

Following consultation, no comments received.

(Decisions included can be executive or non-executive in nature, depending on the delegation given.

Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the

Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


03/02/2025 - B3143, PIDDLETRENTHIDE - 17th February 2025 until 7th March 2025. ref: 4582    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 03/02/2025

Effective from: 03/02/2025

Decision:

Decision: Approved B3143, PIDDLETRENTHIDE - 17th February 2025 until 7th March 2025. This Order will provide Wessex Internet wth a safe working area to install fibre infrastructure. Consultation period: 1st November 2024 to 27th December 2024. Following consultation, no comments received. (Decisions included can be executive or non-executive in nature, depending on the delegation given. Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


31/01/2025 - WATERSTON LANE, LOWER WATERSTON - 10 February 2025 until 10 February 2025, between<br/>09:30 and 15:30. ref: 4580    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 31/01/2025

Effective from: 31/01/2025

Decision:

Decision:

WATERSTON LANE, LOWER WATERSTON - 10 February 2025 until 10 February 2025, between 09:30 and 15:30.

 

This Notice will enable Openreach to carry out pole testing

 

Consultation period: 18 December 2024 - 27 January 2025

 

Following consultation, comments - no comments

 

(Decisions included can be executive or non-executive in nature, depending on the delegation given.

 

Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


30/01/2025 - Scottish and Southern Power Distribution, 13 February 2025 between 08:30 – 15:00 - Tower Hill, Iwerne Minster near Abbey Cottage. ref: 4579    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 31/01/2025

Effective from: 30/01/2025

Decision:

Decision:

 

 

 

Approved

 

 

 

Scottish and Southern Power Distribution, 13 February 2025 between 08:30 – 15:00 - Tower Hill, Iwerne Minster near Abbey Cottage.

 

 

 

This Notice will enable Scottish and Southern Power Distribution safe access to replace a transformer.

 

 

 

Following consultation, no comments received.

Lead officer: Officer Delegated Decision


31/01/2025 - Openreach, 17th February 2025 and 21st February 2025 - Station Road, Child Okeford outside Ansford Cottage. ref: 4578    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 31/01/2025

Effective from: 31/01/2025

Decision:

Decision:

 

 

 

Approved

 

 

 

Openreach, 17th February 2025 and 21st February 2025 - Station Road, Child Okeford outside Ansford Cottage.

 

 

 

This Notice will enable SGN safe access to carry out new connection works.

 

 

 

Following consultation, no comments received.

Lead officer: Officer Delegated Decision


31/01/2025 - Turnworth Village Road, Turnworth - 6th February 2025 until 7th February 2025. ref: 4577    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 31/01/2025

Effective from: 31/01/2025

Decision:

Decision: Approved

Turnworth Village Road, Turnworth - 6th February 2025 until 7th February 2025.

This Notice will enable Wessex Water safe access to carry out emergency works to repair a water main

leak.

Consultation period: N/A as urgent works.

(Decisions included can be executive or non-executive in nature, depending on the delegation given.

Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the

Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


30/01/2025 - Openreach 14 February 2025 between 0830 and 1530 – UNNAMED ROAD, WYNFORD EAGLE between the entrance to Portland Cottage and Brookside Farm. ref: 4574    Recommendations Approved

Decision:

 

 

 

Approved

 

 

 

Openreach 14 February 2025 between 0830 and 1530 – UNNAMED ROAD, WYNFORD EAGLE between the entrance to Portland Cottage and Brookside Farm.

 

 

 

This Notice will enable Openreach safe access to carry out pole replacement. 

 

 

 

Consultation period: 23 December 2024 – 29 January 2025

 

 

 

 

 

Following consultation, no comments received.

Decision Maker: Officer Delegated Decision

Decision published: 30/01/2025

Effective from: 30/01/2025

Decision:

Decision: 

 

Approved 

 

Openreach 14 February 2025 between 0830 and 1530 – UNNAMED ROAD, WYNFORD EAGLE between the entrance to Portland Cottage and Brookside Farm. 

 

This Notice will enable Openreach safe access to carry out pole replacement.  

 

Consultation period: 23 December 2024 – 29 January 2025 

 

 

Following consultation, no comments received. 

 

Lead officer: Officer Delegated Decision


22/01/2025 - Bridport Market – Every Wednesday and Saturday from 05 February 2025 until 01 February 2026 between 0600 and 1700. ref: 4573    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 30/01/2025

Effective from: 22/01/2025

Decision:

Decision: 

 

Approved 

 

Bridport Market – Every Wednesday and Saturday from 05 February 2025 until 01 February 2026 between 0600 and 1700 

 

This Notice is to facilitate a public event on the highway. 

 

Lead officer: Officer Delegated Decision


29/01/2025 - Dorset Council, 10 February 2025 until 14 February 2025 – HERMITAGE ROAD, HERMITAGE between its junction with A352 and Almshouse Farm. ref: 4572    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 29/01/2025

Effective from: 29/01/2025

Decision:

Decision: 

 

Approved 

 

Dorset Council, 10 February 2025 until 14 February 2025 – HERMITAGE ROAD, HERMITAGE between its junction with A352 and Almshouse Farm. 

 

This Notice will enable Dorset Council to carry out surface pre-patching works. 

 

Consultation not carried out by Traffic Team.

Lead officer: Officer Delegated Decision


28/01/2025 - Dorset Shared Prosperity Fund Extension ref: 4566    Recommendations Approved

To endorse a proposal for Dorset Shared Prosperity Fund to be extended for an additional year following government allocation of an additional £1.4 million for FY 2025-2026.

Decision Maker: Cabinet

Made at meeting: 28/01/2025 - Cabinet

Decision published: 29/01/2025

Effective from: 06/02/2025

Decision:

(a)    That the Dorset Shared Property Fund Investment Plan Addendum, as attached in Appendix 1 of the report to Cabinet of 28 January 2025, be endorsed.

 

(b)    That authority be delegated to the Executive Director for Place, in consultation with the Cabinet Member for Property, Assets and Economic Growth, to implement the Investment Plan Addendum.

 

Reason for the decision

 

To support delivery of the Council Plan priorities of

·       Grow our economy

·       Communities for all

·       Respond to the climate and nature crisis

 

And to facilitate use of the funding allocated by government to benefit Dorset residents, communities and businesses.

Lead officer: Jon Bird


28/01/2025 - Care Dorset: Acquisition of an Operating Care Home ref: 4570    Recommendations Approved

The acquisition of an operating care home by Care Dorset.

 

Decision Maker: Cabinet

Made at meeting: 28/01/2025 - Cabinet

Decision published: 29/01/2025

Effective from: 06/02/2025

Lead officer: Mark Tyson


28/01/2025 - Development of Blandford Waste Management Centre ref: 4569    Recommendations Approved

Seeking cabinet approval to award a contract to construct and develop a new waste management centre at Blandford, using the Dorset Highways Works Term Service Contract, within the approved capital funding.

 

Decision Maker: Cabinet

Made at meeting: 28/01/2025 - Cabinet

Decision published: 29/01/2025

Effective from: 28/01/2025

Decision:

(a)    That the award of a contract to construct and develop a new waste management centre at Blandford, using Dorset Highways Works Term Service Contract within the approved capital funding, be approved.

 

(b)    That authority be delegated to the Executive Director for Place in consultation with the Cabinet Member for Place Services and the Section 151 Officer to agree the contract terms.

 

Reason for the decision

To deliver works to secure critical infrastructure in Blandford for the development of a strategic waste transfer facility in central Dorset which will provide the capacity to maximise the benefits of operational efficiency and resilience to provide business continuity. 

 

 

Lead officer: Gemma Clinton


28/01/2025 - Planning Obligation Monitoring Fees ref: 4564    Recommendations Approved

This item seeks Cabinet approval of a fee to be included in future legal agreements to support the effective monitoring and management of planning obligations including those relating to the delivery of infrastructure.

Decision Maker: Cabinet

Made at meeting: 28/01/2025 - Cabinet

Decision published: 29/01/2025

Effective from: 06/02/2025

Decision:

(a)    That Dorset Council applies a monitoring fee to support the cost of monitoring and reporting on planning obligations. The fee would be based on the values and methodology outlined in the report and applied to all planning applications submitted from the 1April 2025 which require a planning obligation.

 

(b)    That following implementation, authority be delegated to the Executive Director for Place Services and anyone nominated by him in the scheme of nomination, to update the fee as necessary in consultation with the Cabinet Member for Planning and Emergency Planning.

 

Reason for the decision

To enable the implementation of charges to support the staffing resource in the monitoring and compliance of approved s106 Planning legal agreements.    

 

 

Lead officer: Andrew Galpin


28/01/2025 - Local Authority Housing Fund 3 ref: 4565    Recommendations Approved

To request Cabinet’s support to allocate the funding to a Registered Provider (RP) who will use this funding along with their own resources to source 10 properties.

 

Decision Maker: Cabinet

Made at meeting: 28/01/2025 - Cabinet

Decision published: 29/01/2025

Effective from: 06/02/2025

Decision:

(a)  That £1,744,421 be granted to a Housing Association (HA) after a competition process, who would act as the delivery vehicle and purchase the 10 properties using these funds and their own funds. Completion of the purchase of the properties to be finalised 31st March 2026.

 

(b)  That a lettings plan is put in place with the successful HA so Dorset Council can ensure the properties are allocated in accordance with the funding requirements.

 

Reason for the decision

 

Dorset Council now owned 30 properties that were purchased with the funding granted from the Government as part of LAHF1, 26 of the properties were purchased to house Ukraine refugees and 4 of the properties were purchased to house Afghan refugees in accordance with conditions attached to the grant payment. All of these properties at some future date and on becoming vacant could be used as temporary accommodation to house those who were homeless or potentially homeless. The project was very successful however had taken a lot of resource from the Council’s Housing and Assets teams to carry out the work. Additionally, the Council was only able to grant non secure tenancies as the Council was not currently a stock holding authority. A requirement of the LAHF3 funding was that the Afghan refugees were offered secure tenancies.

To meet the short deadline, offer secure tenancies to the families from Afghanistan the properties should be provided, owned and managed by a registered provider.

Lead officer: Vikki Jeffrey


28/01/2025 - Care Dorset Holdings Ltd Annual Performance Report ref: 4567    Recommendations Approved

To consider the performance report produced by Care Dorset Holdings Ltd.

Decision Maker: Cabinet

Made at meeting: 28/01/2025 - Cabinet

Decision published: 29/01/2025

Effective from: 28/01/2025

Decision:

That the contents of the Care Dorset report be received and noted.

Reason for the decision

Care Dorset was a major delivery partner to Dorset Council for adult social care and support. Much remained to be done to drive improvements to Care Dorset’s operation and to grow the organisation, both in volume and revenue. The report set out the work completed over the last 12 months to achieve Care Dorset and Dorset Council’s shared ambitions.

 


28/01/2025 - Dorset Centre of Excellence Annual Performance Report ref: 4568    Recommendations Approved

To consider the performance report produced by The Dorset Centre of Excellence.

Decision Maker: Cabinet

Made at meeting: 28/01/2025 - Cabinet

Decision published: 29/01/2025

Effective from: 28/01/2025

Decision:

That the Dorset Centre of Excellence Performance report be received and noted.

 

Reason for the decision

To ensure Cabinet are fully informed of the current DCOE performance.

 


28/01/2025 - Our Future Council Business Case and Transformation Plan ref: 4563    Recommendations Approved

·     Full business case setting out case for change and vision for the future with options to deliver whole council transformation.

·     Final transformation plan more fully formed to support the delivery programme for OFC and provide detail on wider service transformation plans.

·     Setting out strategic framework for transformation for 2025-29

Decision Maker: Cabinet

Made at meeting: 28/01/2025 - Cabinet

Decision published: 29/01/2025

Effective from: 06/02/2025

Decision:

(a)       Cabinet endorsed the overall vision and design of Our Future Council operating model and transformation programme as detailed in the business case at Appendix A of the report to 28 January 2025.

 

(b)       That the proposed costs, savings and implementation plans based on scenario 4 as set out in sections 4 and 5 of the report and in more detail in the business case at Appendix A, sections 4 and 5, be approved.

 

(c)        That Cabinet notes that this business case was based on the proposal to transform the organisation, implement a new operating model, and increase productivity through the greater use of technology. The proposal identified an estimated potential investment of £48.33M over the period 2025-28, which would release cumulative staff savings of £77.4M over the period 2025-30.

 

(d)       That Cabinet notes that the Our Future Council programme would continue to be refined as we moved into the implementation phase, but to fund the business case Cabinet agreed to:

 

(i)    Earmark a further £13M in addition to the £12M already committed to the capital programme for the Enterprise Resource Planning system. This would fund the potential investment in technology and process change – noting that individual funding decisions in excess of the key decision threshold would be subject to individual business cases to be brought before Cabinet for approval.

 

(ii)   That Cabinet approve the estimated redundancy costs of £9.5M over the programme, be initially funded from reserves, noting that the reserves would need to be replenished through budget savings over subsequent years.

 

(iii) That Cabinet approve the need for investment in internal and external additional capacity to implement the project, to be reviewed on an annual basis, with year one of the capacity to be funded through the approved transformation reserve of £3M and the flexible use of capital receipts.

 

(iv)   That political oversight be provided by the Members transformation steering group.

 

(v)    That the recommendations from the Joint Overview Committee, set out in section 6 of the report, be noted and the Dorset Council Transformation Plan 2025-29, be approved, as attached at Appendix B as the framework for supporting, governing and delivering change across the council.

 

Reason for the decision

 

The proposals outlined in the “Our Future Council Business Case and Transformation Plan” report to Cabinet of 28 January 2025 lay the groundwork for a comprehensive programme of transformation and improvement, enabling Dorset Council to achieve its priorities within a sustainable medium-term financial strategy. The ambition and commitment o improvement and delivery as part of “Our Future Council” initiative aligned with the Council Plan priorities and our new operating model section.

Lead officer: Nina Coakley, Lisa Cotton


28/01/2025 - December 2024 (Period 9) Financial Management Report 2024/25 ref: 4562    Recommendations Approved

To consider the December 2024 (Quarter 3) Financial Management Report 2024/25.

 

Decision Maker: Cabinet

Made at meeting: 28/01/2025 - Cabinet

Decision published: 29/01/2025

Effective from: 06/02/2025

Decision:

(a)  That the Senior Leadership Team’s forecast of the full year’s outturn for the Council, made at the end of December 2024 including progress of the transformational and efficiency savings incorporated into the budget, be noted.

 

(b)  That the capital programme for 2024/25, be noted.

 

(c)  That the allocation of £7m from reserves to support the repairs and maintenance compliance work of the council’s property portfolio be approved.

Reason for the decision

 

The Council provided a mix of statutory and discretionary services to communities across Dorset and was legally required to set a balanced budget every year, and so must deliver services within the resources made available through the revenue and capital budgets for 2024/25. 

The report summarised the Council’s forecast financial performance for the 2024/25 year as at the end of December 2024.

 

Lead officer: Sean Cremer


29/01/2025 - Openreach, 29 January 2025 between 0930 and 1430 – Gallows Drive, West Parley at its junction with Christchurch Road. ref: 4571    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 29/01/2025

Effective from: 29/01/2025

Decision:

Decision: 

 

Approved 

 

Openreach, 29 January 2025 between 0930 and 1430 – Gallows Drive, West Parley at its junction with Christchurch Road. 

 

This Notice will enable Openreach safe access to carry out urgent works in the highway to restore customer service. 

 

Urgent works therefore no consultation carried out. 

 

 

Lead officer: Officer Delegated Decision


24/01/2025 - Openreach, 27 January 2025 between 0930 and 1530 – RUSHALL LANE, CORFE MULLEN between its junction with Knoll Lane and the entrance to Florence Cottage. ref: 4547    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 27/01/2025

Effective from: 24/01/2025

Decision:

Decision:

 

 

 

Approved

 

 

 

Openreach, 27 January 2025 between 0930 and 1530 – RUSHALL LANE, CORFE MULLEN between its junction with Knoll Lane and the entrance to Florence Cottage.

 

 

 

This Notice will enable Openreach safe access to carry out urgent works in the highway to restore customer service.

 

 

 

Urgent works therefore no consultation carried out.

Lead officer: Officer Delegated Decision


24/01/2025 - Dorset Council, 26 January 2025 until 28 January 2025 – [1] THE ESPLANADE, WEST BAY in its entirety. [2] PIER TERRACE, WEST BAY in its entirety. [3] BRIDPORT ARMS ROAD, WEST BAY in its entirety. ref: 4546    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 27/01/2025

Effective from: 24/01/2025

Decision:

Decision:

 

 

 

Approved

 

 

 

Dorset Council, 26 January 2025 until 28 January 2025 – 

 

[1] THE ESPLANADE, WEST BAY in its entirety. 

 

[2] PIER TERRACE, WEST BAY in its entirety. 

 

[3] BRIDPORT ARMS ROAD, WEST BAY in its entirety.

 

 

 

This Notice will enable Dorset Council to install flood defence barriers. 

 

 

 

Urgent and internal therefore no consultation carried out.

Lead officer: Officer Delegated Decision


27/01/2025 - Openreach, 28 January 2025 between 0930 and 1530 – WOODLINKEN CLOSE, VERWOOD between its junction with Rowan Drive and its junction with Woodlinken Way. ref: 4545    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 27/01/2025

Effective from: 27/01/2025

Decision:

Decision:

 

 

 

Approved

 

 

 

Openreach, 28 January 2025 between 0930 and 1530 – WOODLINKEN CLOSE, VERWOOD between its junction with Rowan Drive and its junction with Woodlinken Way.

 

 

 

This Notice will enable Openreach safe access to carry out urgent works in the highway to restore customer service.

 

 

 

Urgent works therefore no consultation carried out.

Lead officer: Officer Delegated Decision


27/01/2025 - Stapehill Road Wimborne - 27th January 2025 until 27th January 2025. ref: 4544    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 27/01/2025

Effective from: 27/01/2025

Decision:

Decision: Approved Stapehill Road Wimborne - 27th January 2025 until 27th January 2025. This Notice is required due to health and safety reasons due to flooding. Consultation period: N/A as emergency works (Decisions included can be executive or non-executive in nature, depending on the delegation given. Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the Scheme of Delegation in the Council’s Constitution).

Lead officer: Officer Delegated Decision


27/01/2025 - A357 HIGH STREET, STALBRIDGE - 10th February 2025 until 14th February 2025. ref: 4543    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 27/01/2025

Effective from: 27/01/2025

Decision:

Decision: Approved A357 HIGH STREET, STALBRIDGE - 10th February 2025 until 14th February 2025. This Notice will provide SGN with safe access to make a new connection. Consultation period: 6th December 2024to 9th January 2025. Following consultation, no comments received. (Decisions included can be executive or non-executive in nature, depending on the delegation given. Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


24/01/2025 - FRANCHISE STREET, WEYMOUTH - 27 January 2025 until 31 January 2025. ref: 4542    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 24/01/2025

Effective from: 24/01/2025

Decision:

Decision: FRANCHISE STREET, WEYMOUTH - 27 January 2025 until 31 January 2025. This Notice will enable Wessex Water safe access to carry out sewer repair in the highway. Consultation period: 17/12/24 - 13/01/25 Following consultation, comments - no comments received (Decisions included can be executive or non-executive in nature, depending on the delegation given. Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


24/01/2025 - C97, MAPPOWDER - 27th January 2025, between 09:30 and 15:30. ref: 4541    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 24/01/2025

Effective from: 24/01/2025

Decision:

Decision: Approved

C97, MAPPOWDER - 27th January 2025, between 09:30 and 15:30.

This Notice will enable Openreach safe access to carry out urgent works in the highway to restore

customer service.

Consultation period: N/A as urgent works

(Decisions included can be executive or non-executive in nature, depending on the delegation given.

Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the

Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


24/01/2025 - HOLLOWAY ROAD, DORCHESTER - 7 February 2025 until 7 February 2025, between 09:30 and 15:30. ref: 4540    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 24/01/2025

Effective from: 24/01/2025

Decision:

Decision:

HOLLOWAY ROAD, DORCHESTER - 7 February 2025 until 7 February 2025, between 09:30 and 15:30.

This Notice will enable Openreach safe access to telegraph poles to provide overhead cabling.

Consultation period: 18/12/24 - 24/01/25

Following consultation, comments - no comments received

(Decisions included can be executive or non-executive in nature, depending on the delegation given.

Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the

Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


20/01/2025 - Wimborne St Giles Neighbourhood Plan 2021 to 2036 ref: 4531    Recommendations Approved

The Wimborne St Giles Neighbourhood Plan 2021 to 2036 – Independent Examiner’s Report and Progress to Referendum

 

Decision Maker: Cabinet Member for Planning and Emergency Planning

Decision published: 24/01/2025

Effective from: 20/01/2025

Decision:

a)    The Wimborne St Giles Neighbourhood Plan 2021 to 2036, as modified (please see Appendix B), can proceed to referendum.

b)    A recommendation to ‘make’ the Wimborne St Giles Neighbourhood Plan 2021 to 2036 be made to a Cabinet meeting after the referendum if the result of the referendum is in support of making the plan and there are no other issues identified that would go against such a decision.

 

Wards affected: Cranborne and Alderholt;

Lead officer: Nick Cardnell


23/01/2025 - C94 & C21, Stalbridge - 22nd January 2025 until 23rd January 2025. ref: 4539    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 23/01/2025

Effective from: 23/01/2025

Decision:

Decision: Approved C94 & C21, Stalbridge - 22nd January 2025 until 23rd January 2025.

 

This Notice will enable Openreach safe access to carry out emergency works to replace a telegraph pole.

 

 Consultation period: N/A as emergency works. (Decisions included can be executive or non-executive in nature, depending on the delegation given. Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


23/01/2025 - Cheap Street, Sherborne - 19th January 2025 until 24th January 2025, between 07:13 and 23:59. ref: 4538    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 23/01/2025

Effective from: 23/01/2025

Decision:

Decision: Approved

Cheap Street, Sherborne - 19th January 2025 until 24th January 2025, between 07:13 and 23:59.

This Notice will enable Scottish and Southern Power Distribution safe access to carry out emergency works

to repair a cable fault.

Consultation period: NA as emergency works.

(Decisions included can be executive or non-executive in nature, depending on the delegation given.

Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the

Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


23/01/2025 - Smiths Lane, Piddletrenthide - 10th February 2025 until 21st February 2025. ref: 4537    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 23/01/2025

Effective from: 23/01/2025

Decision:

Decision: Approved

Smiths Lane, Piddletrenthide - 10th February 2025 until 21st February 2025.

This Order will provide Wessex Internet with a safe working area to undertake fibre cable installation.

Consultation period: 5th November 2024 to 31st December 2024.

Following consultation, no comments received.

(Decisions included can be executive or non-executive in nature, depending on the delegation given.

Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the

Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


23/01/2025 - FOLKE LANE, ALWESTON - 10th February 2025 until 12th February 2025. ref: 4536    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 23/01/2025

Effective from: 23/01/2025

Decision:

Decision: Approved FOLKE LANE, ALWESTON - 10th February 2025 until 12th February 2025. This Notice will enable Wessex Water to Replace a Fire Hydrant Chamber. Consultation period: 31 October 2024 to 12 December 2024. Following consultation, no comments received. (Decisions included can be executive or non-executive in nature, depending on the delegation given. Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


23/01/2025 - Cauldron Crescent, Swanage - 6th February 2025 until 7th February 2025. ref: 4535    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 23/01/2025

Effective from: 23/01/2025

Decision:

Decision: Approved

Cauldron Crescent, Swanage - 6th February 2025 until 7th February 2025.

This Notice will enable Wessex Water safe access to repair a defect in the highway.

Consultation period: 5th December 2024 to 9th January 2025.

Following consultation, no comments received.

(Decisions included can be executive or non-executive in nature, depending on the delegation given.

Please state if the delegation was granted by the Cabinet or any other Committee or is detailed within the

Scheme of Delegation in the Council’s Constitution.)

Lead officer: Officer Delegated Decision


23/01/2025 - Openreach, 19:00 on 6th February until 07:00 on 7th February 2025 - Bournemouth Road, Blandford St Mary between The Maltings and Kilderkin Cottage. ref: 4534    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 23/01/2025

Effective from: 23/01/2025

Decision:

Decision:

 

 

 

Approved

 

 

 

Openreach, 19:00 on 6th February until 07:00 on 7th February 2025 - Bournemouth Road, Blandford St Mary between The Maltings and Kilderkin Cottage.

 

 

 

This Notice will enable Openreach safe access to access their overhead network in the highway.

 

 

 

Following consultation, no comments received.

Lead officer: Officer Delegated Decision


23/01/2025 - Openreach, 7 February 2025 between 09:30 – 15:30 - Various Roads, Pamphill as listed: [i] Cowgrove Road as indicated by signage on site; [ii] Vine Hill as indicated by signage on site. ref: 4533    Recommendations Approved

Decision Maker: Officer Delegated Decision

Decision published: 23/01/2025

Effective from: 23/01/2025

Decision:

Decision:

 

 

 

Approved

 

 

 

Openreach, 7 February 2025 between 09:30 – 15:30 - Various Roads, Pamphill as listed: [i] Cowgrove Road as indicated by signage on site; [ii] Vine Hill as indicated by signage on site.

 

 

 

This Notice will enable Openreach safe access to carry out pole testing works in the highway.

 

 

 

Following consultation, no comments received.