Installation of a Battery Energy Storage System of up to 49.9MW, associated infrastructure and enclosing compound, together with access and landscaping works.
Minutes:
The Case Officer provided members with the following update;
With the aid of a visual presentation including plans and
aerial photographs, the Case Officer identified the site, which was located
between Southill and Chickerell, and explained the proposal and relevant
planning policies to members. Members were informed of the planning
considerations including site boundaries, proximity to residential properties,
and its current use for horse grazing. The site was characterized by several
constraints, including surface water flood risk, public rights of way, a mineral
safeguarding area, and the presence of a national grid overhead line.
Photographs from the southern boundary of the site provided a clear perspective
looking towards the site.
The previous planning application, was refused in March 2024
due to concerns related to fire safety, contamination, single vehicular access
and ack of vehicle passing places. The current planning application was a
revised scheme to address the reasons for refusing the earlier application..
Key changes in the proposed layout included a reduction in power capacity, the
introduction of a secondary emergency access route, and a well-considered
landscaping plan featuring wildflowers and shrub planting that aligned with
existing features. The overall design aimed to provide a well-contained
environment that offered significant amenity benefits. Significant attention
had been given to drainage strategies developed in collaboration with the
council’s flood risk management team. . Additionally, the initiative
incorporated renewable and low-carbon technologies, targeting electricity
storage that could support approximately 19,500 households across
Dorset—representing 8.7% of local demand. The key planning issues favourably
supported the principle of development, aligning with national planning
practice guidance and NFCC standards for health and safety. The Officer’s
recommendation was to grant planning permission subject to conditions set out
in the officer report.
Public Participation
Mr Fannon spoke in objection to the proposal. He questioned
the absence of credible test data, emphasizing that safety couldn't be assumed
without real-life evidence. He highlighted that containers burn for days and
felt that BES facilities belong far from communities. The applicant's promise
of minimal energy supply—only 1.7 watts per home—seemed inadequate. With the
threat of toxic smoke looming. He hoped the committee would consider the safety
of residents and refuse the proposal.
Kay Kelsall felt that the application failed to meet fire
chief requirements for two distinct access points. The report acknowledged that
the secondary eastern route merged with the primary route, undermining safety.
While the applicant cited prevailing northern winds, real-life examples reveal
the risks posed by smoke and toxins from fires, not the flames themselves.
There’s no substantiated evidence of an effective fire response to mitigate
these concerns. Ms Kelsall felt that the proposal was unacceptable and urged
members to refuse.
John Perrot also spoke in objection to the proposal. He felt
that the concerns regarding the FRS were valid and should have been prioritized
by the committee. The poor application design raised significant issues,
particularly with contaminated water. Previous refusals highlight the flaws
which remained unaddressed. Three minutes is insufficient to fully outline the
inconsistencies, especially regarding pollution control. The similarity of the
two applications cannot be ignored. It’s crucial to uphold Policy 9 of the NPPF
and object accordingly.
Chris Cox spoke on behalf of the applicant. He felt that the
proposal represented a significant step forward in addressing previous concerns
and delivering a project which prioritized safety, environmental benefits, and
renewable energy security. From the outset, the applicant and agent had worked
closely with Dorset & Wiltshire Fire and Rescue Service, engaging with them
to ensure that fire safety measures met and exceeded their requirements. Their
input had been invaluable in shaping a comprehensive approach to fire
prevention, detection, and suppression. To address the committee’s previous
concerns about emergency access, a secondary access route had now been
incorporated into the design. This ensured that emergency services would always
have rapid and reliable access to the site. In terms of fire safety, the
proposal incorporated cutting-edge systems which would work together to create
one of the most robust fire safety frameworks in the industry. All statutory
bodies, including the Environment Agency, Dorset & Wiltshire Fire and
Rescue, and public health officers, had raised no objections, demonstrating
their confidence in its safety and design. Additionally, significant
biodiversity enhancements would have been delivered. To conclude, the project
adopted the most advanced safety systems of any Battery Energy Storage System
in Dorset. It supported renewable energy generation and contributed to the UK’s
energy security, whist also delivering environmental benefits to the local
area. Mr C Cox thanked the officer for their comprehensive report and hoped
members would support.
Cllr David Palmer spoke on behalf of Chickerell Town Council
who hoped the committee would overturn the officer recommendation and refuse
the planning application. He highlighted their justification for requesting the
committee to refuse based on the proximity of the proposed site to both an
existing urban area and proposed new housing development, which if agreed,
would have delivered 393 new houses and land for a primary school adjacent to
the proposed storage site. Cllr Palmer highlighted the concerns of the residents
of Chickerell through their attendance at Town Council meetings and
conversations with Councillors. They were concerned regarding the fire risk and
the potential release of hazardous chemicals and the health risks that it would
impose. The Town Council also referred to the Chickerell Neighbourhood Plan,
highlighting wildlife corridors and the importance of protecting land from
potential development. Cllr David Palmer also highlighted the proximity of the
proposed development to the football stadium and the Dorset Police Divisional
HQ, arguing the potential risks in evacuation of the sites if necessary due to
a major incident caused by the proposed battery storage site. In conclusion,
Chickerell Council believed that the Committee should listen to the concerns of
residents and acknowledge the intentions and commitments of Neighbourhood Plans
and in so doing, refuse the application.
Members questions and comments
Having had the opportunity to discuss the merits of the
application and an understanding of all this entailed; having considered the
officer’s report and presentation; the written representatives; and what they
had heard at the meeting, a motion to defer was recommended and proposed
by Cllr Toni Coombs and seconded by Cllr Craig Monks.
Decision: Defer the application to seek further clarification or an amendment regarding an additional access point.
Supporting documents: