Erection of 9 dwellings (Use Class C3), including access, drainage, landscaping and associated infrastructure.
Minutes:
The Lead Project Officer
presented the report for the application and provided an update on the
Community Infrastructure Levy (CIL) figures. A map was shown illustrating the
application site in relation to Stoborough and Wareham.
It was noted that the site was situated outside the settlement boundary of Stoborough. Notable points in the nearby area were
highlighted and included a primary school, a village hall and a field north of
the site, which had previously been subject to a planning application which
members had agreed to approve.
Members
were advised that CIL liability on the site had increased to £370k with
indexation but this was not a material consideration.
Photographs of the site were displayed, showing that the application site was currently undeveloped pastureland. Existing hedgerows formed the boundaries of the site, along with several trees. A pre-commencement tree protection condition was recommended.
The proposal was for nine
dwellings with access from the southern side of West Lane, comprising a mix of
two, three and four-bedroom units. It was explained that the scheme had been
amended to reduce the number of dwellings from twelve to nine. Plans were
presented showing the size, scale, and appearance of the buildings, which would
feature varied materials including red brick, render, and Purbeck stone, with
roofs finished in a mix of slate and tile. Indicative street scenes were also
shown.
Plans for the access from
West Lane were outlined, including the extension of the pedestrian footpath. As
there was currently no pavement along West Lane connecting to the village,
provision would be made for connecting the path to the village, which would be
secured through the legal agreement.
It was noted that the site
was within walking distance of the Bog Lane Suitable Alternative Natural
Greenspace (SANG) and was accessible via existing footpaths. It was located
within Flood Zone 1 but was subject to some surface water flood risk. In
response to drainage concerns, the applicant had provided a surface water
drainage strategy, which included water storage beneath paving and some
driveways, with water draining to an attenuation basin.
It was explained that the
Council’s previous five-year housing supply position had expired, and a new
assessment indicated that the Council could only demonstrate 2.53 years of
supply. Paragraph 11(d) of the National Planning Policy Framework (NPPF) therefore
applied, stating that applications should be granted unless there were strong
reasons for refusal. Officers considered that the application was acceptable in
principle and that nutrient mitigation could be achieved through credits.
There were no public
speakers.
In response to members
questions officers provided the following responses:
· One unit was displayed in the plans as featuring solar
panels, however renewable energy systems were not required to make the
application acceptable in planning terms.
· The surface water drainage scheme had been reviewed by
the Lead Local Flood Authority and they were satisfied
that the development would be safe for its lifetime from flooding.
· There was an existing pedestrian crossing point on
West Lane and the Highways Authority were satisfied that the existing crossing
point offered safe access into the development.
· There was no policy requirement that the units be
accessible, although one unit was designed to be adaptable with no structural
change required if future occupants needed to make alterations to the access.
· A previous application on a site nearby was granted
planning permission with a condition that required the improvement of a footway
on West Lane. The application in question also had the same condition as it was
necessary to make the application acceptable. It was explained that the two
developers were able to decide how the improvements are carried out.
· The S106 legal agreement requires that drainage
maintenance is carried out and this responsibility
would pass onto the owners of the properties.
· Details about landscaping were required to be
submitted and approved and maintenance would be required for 5 years.
· An informative note could be added to state that the
hedgerow should be retained and maintained in perpetuity.
· There were no garages for the 2-bedroom units, however
all units had off-road parking spaces.
Members commented that the
application was well designed and would be in keeping with the area.
It was proposed by Cllr
Flower and seconded by Cllr Brenton that the application be granted as per the
officer’s recommendation and with the added informative note about the
retention of the hedgerow.
Decision:
That authority be delegated
to the Service Manager for Development Management and Enforcement and Development
Management Area Manager East to Grant, subject to the conditions set out in the
appendix to these minutes and the completion of a S106 agreement to secure a
financial contribution of £297,000 towards Affordable Housing provision in lieu
of on-site provision and an ongoing requirement for property owners to retain
and maintain surface water drainage infrastructure in accordance with details
to be agreed.
Or
That planning permission be
refused for the reason set out at in the appendix to these minutes, if the S106
agreement is not completed by 19 May 2026 (6 months from the date of the
committee) or such date as may be agreed with the Service Manager for Development
Management and Enforcement or Development Management Area Manager East.
Supporting documents: