An outline application for up to 328 dwellings with full details supplied in respect of 143 dwellings (Phase A) including creation of new accesses onto School Hill and Chickerell Link Road (B3157), including details of the internal spine road, landscaping, drainage, car parking, public open space and associated works for Phase A. All other matters reserved in respect of 185 dwellings (Phases B and C) and land for a primary school, public open space including, landscaping and associated works
Minutes:
The Lead Project Officer presented the application
and outlined the site location, which was shown on a map. Members were advised
that the site fell within the Defined Development Boundary, outside the
National Landscape designation, outside any Conservation Area, and outside the
setting of Listed Buildings. Public rights of way crossing and adjoining the
site were highlighted. It was explained that the site was steeply sloping and included
areas within Flood Zones 2 and 3, areas susceptible to surface water flooding
and groundwater flooding, and land adjacent to an electricity substation.
National flood risk assessment maps were displayed, together with plans showing
nearby uses, including a solar farm, battery storage facility, electricity
substation and Wessex Golf Centre.
It was explained that the development was proposed
to come forward in four phases. Phases A and D formed part of the detailed application,
while Phases B and C, together with the proposed primary school site, were
submitted in outline. Plans illustrating the different phases were shown. It
was advised that amended plans had been submitted in March 2026 and that
revised plans received in June 2026 had addressed a number of concerns. As
consultation on the revised plans remained ongoing, the recommendation was to
delegate authority to grant permission subject to no new material planning
considerations arising in response to the consultation period. Members were
advised to assess the application on the basis of the revised plans.
The proposed masterplan was presented, together
with examples of house types, elevations, and floor plans, demonstrating a
variety of designs and materials. Four apartment blocks were proposed, the
largest of which would be three storeys in height. All dwellings would be
constructed to Future Homes Standard requirements and would incorporate solar
photovoltaic panels, electric vehicle charging points and heat pumps. Plans
were shown which illustrated heat pumps across the development.
Detailed plans of the northern section of the site
were shown, including parking arrangements to the front or side of properties
and the relationship of development to the site's changing levels. Retaining
walls were proposed to accommodate the steep topography, together with green corridors
through Phase A. Visitor parking spaces would be incorporated within the
streets and courtyards, including parking provision associated with the
apartment blocks. Members were shown details of the proposed retaining
structures, with northern retaining features consisting of walls with 1.8 metre
fencing above and southern retaining features comprising 1.3 metre walls with
1.8 metre fencing. Illustrative images and sections demonstrated how these
features would appear in practice and their relationship with neighbouring
properties. A landscape plan showed green corridors, street trees, structural
planting and a drainage basin on the eastern side of the development. A
rendered street scene was also displayed.
It was explained that all dwellings would be served
by parking, supplemented by visitor parking spaces. The majority of properties
would be two storeys in height, with the exception of the larger apartment
block. It was acknowledged that the height of some retaining features would
need to be weighed carefully in the planning balance. Further site sections
were presented, including worst-case scenarios illustrating relationships with
neighbouring dwellings and proposed apartment blocks.
The landscaping strategy was outlined, including
strategic planting to provide ecological connectivity, public open space
linking rights of way, specimen tree planting, woodland planting and native shrub
planting. An east-west green corridor through the site was proposed and was
considered capable of serving both ecological and recreational functions. An
Open Space Management Plan would be secured by condition. Additional areas of
public open space, drainage features and land reserved for a future primary
school were identified, with a design code for the school site proposed through
condition.
Plans relating to Phases B and D, together with highway
layouts for the central avenue and southern access, were presented. Members
were shown extensive photographs from viewpoints across the site, illustrating
access points, neighbouring properties, the significant changes in levels
across the land, views towards the solar farm, and views from public footpaths
around the site. Photographs also demonstrated the relationship between the
proposed development areas and the surrounding landscape.
The key planning issues associated with the
application were outlined. Concerns regarding design had previously been
raised, but it was considered that the revised plans had significantly improved
the scheme. The use of materials, building lines and boundary treatments was
considered to create a more cohesive street scene. Previous concerns relating
to embankments had been largely addressed, with conditions proposed to secure
detailed design and construction information. While some concerns raised by the
Urban Design Officer remained outstanding, particularly in relation to highways
and the overlooking of parking courtyards, it was considered that these matters
could be addressed by condition.
The impact on residential amenity was assessed,
particularly in relation to the proposed retaining features, which could reach
a maximum height of 4.8 metres. Whilst these features were not considered
ideal, they would allow level gardens and access to dwellings and would avoid retaining
structures being positioned directly at street level. It was noted that
accommodating the site's levels in this way had resulted in a reduction in
housing numbers, and that the impacts should be balanced against the benefits
of delivering housing on the site.
Ecological matters were also addressed. Conditions
were recommended to mitigate impacts on protected species and to retain dark
corridors across the development. Although the Natural Environment Team had been
unable to fully assess the likely effectiveness of some mitigation measures,
additional wildlife corridors were proposed to maintain ecological
connectivity. Bat and bird boxes would be secured by condition, together with a
minimum of seven wildlife tunnels. A dormouse bridge would also be provided,
with its location and design secured through condition. It was concluded that,
with these mitigation measures in place, ecological concerns relating to east-west
connectivity could be satisfactorily addressed.
Flood risk considerations were discussed in detail.
The proposed drainage basins were shown on plans, with modelling demonstrating
post-development flood scenarios. It was explained that the drainage basins
would have a permanent maximum water depth of approximately 0.3 metres and
would not require fencing. Following assessment, it was concluded that the
development would deliver an overall betterment in flood risk terms and would
not increase flooding on third-party land. The proposal was therefore
considered acceptable on flood risk grounds.
One matter raised by Sport England concerned the
relationship between the development and the adjacent golf course. A golf
strike assessment commissioned by the applicant had identified a risk from two
southern tees affecting part of the site. Various mitigation options had been
explored, resulting in the removal of all housing and public open space from the
area identified as being at risk. A condition was proposed requiring a strategy
to address golf strike risks, with the affected area remaining inaccessible to
the public.
Environmental Health had raised no objections
regarding noise. Noise and fire safety matters had been considered through the
battery energy storage application process, and the proposed residential
development was considered acceptable in these respects.
It was advised that highways officers had raised no
objections subject to conditions relating to site access, bus stops and a
travel plan. Landscape Officer concerns had been largely addressed through
revisions to the scheme and the provision of more meaningful public open space.
Conditions would require full landscaping details to be approved. Plans
relating to public rights of way were presented, including proposed diversions
and new connections. Although a representation had been received recommending enhanced
pedestrian links to Granby Industrial Estate, this was not considered
necessary. Chickerell Town Council had expressed an interest in taking
responsibility for the future management of open spaces within the development.
It was confirmed that conditions relating to land
contamination were proposed and that no harm would arise to heritage assets. A
condition requiring a programme of archaeological investigation and recording
was also recommended.
Details of the proposed infrastructure contributions
were presented, including financial contributions towards NHS services,
education provision, Weymouth Swimming Pool and Willowbed
Hall.
The Lead Project Officer concluded by outlining the
benefits of the scheme. The proposal would deliver 328 dwellings on an
allocated site at a time when the Council could not demonstrate a five-year
housing land supply. Significant weight was attached to the provision of
affordable housing, with the scheme delivering the policy-compliant level of
35%. Affordable housing would be distributed throughout the development and
integrated with the market housing. Additional benefits included a new bus
link, improved walking and cycling connections, enhanced connectivity with
existing settlements and the provision of substantial and meaningful public
open space. It was considered that the benefits of the proposal were not
significantly or demonstrably outweighed by any adverse impacts.
Public representation was received in objection to
the application from Esther Dadds. She expressed
concern about the loss of greenspace in the area and the impact on wildlife and
also believed that the proposal would result in the town of Chickerell
extending to unacceptable levels.
The applicant, David Buczynskyj, spoke in support
of the application. He noted that the proposal would provide homes on an
allocated site, including a policy compliant level of affordable housing,
equating to 115 affordable homes. The proposal also included community
benefits, such as delivering key infrastructure, providing the site for a new
school and generating investment into the area.
Cllr Clifford spoke as the ward member for the
application. He expressed concern that the consultation period was still open
and so statutory consultees could still object to the application. He also
questioned whether new homes were needed in Chickerell specifically, given the
Town Council and residents had concern that it was merging with Weymouth.
Concerns were also raised about insufficient care given to protecting wildlife
in the area and the lack of a health centre being provided by the scheme, which
was the preference of the Town Council.
In response to public representations the
Development Management Area Manager explained that parking provision on site
was policy compliant; an application referenced by one speaker actually
referred to the proposed allocation of the site in a previous Local Plan and
since then the site had been allocated; in reference to the consultation period
still being open, the committee would make a decision to delegate authority to
officers to grant the application and if new planning considerations came
forward the application would return to committee; there had been extensive
engagement over ecology on the site and officers considered that concerns had
been satisfactorily addressed through planning conditions.
In response to questions from members officers
provided the following responses:
· No comments had been
received from the NHS in reference to the provision of a new doctor’s surgery.
· Condition 24 secured
connectivity to the wildlife corridor for hedgehogs.
· An informal area of play as
well as a Locally Equipped Area of Play (LEAP) to include 12 pieces of
equipment was included in the proposal and highlighted on plans of the site.
· The cycle paths on site
would connect to the wider cycle network.
· If new planning
considerations came forward during the consultation period a decision would be
made by officers in consultation with the Chair to decide whether the
application would need to return to committee.
· Maintenance for public open
spaces was calculated through a formula and the Town Council had expressed they
were keen to take on maintenance of the public open spaces on site.
· The southern access would
be considered the main access into the site and no more than 100 dwellings could
be occupied before the construction of the access road was completed.
· A condition was proposed
that would agree timetables for the delivery of the phases of the development.
· The proposal included the
land for a new school rather than the school itself and it could be delivered
either by Dorset Council or the Department for Education. The design code for
the school was recommended on the basis that it was on an elevated site.
· The attenuation ponds had
been designed in relation to SuDS guidance and in
this case because of the low level of permanent water on the site, fencing
wasn’t being recommended.
· Retaining features would
restrict the movement of wildlife on the site, however it was considered that
sufficient mitigation was provided in the form of wildlife corridors.
· Heat pumps and solar panels
were included in the scheme.
· There had been no objection
from the Lead Local Flood Authority and there was no detail about the siting of
the buildings on the school site at this stage, however any future application
for that site would have to be policy compliant.
· When the Battery Energy
Storage System (BESS) application was determined, future residents of this site
were considered, and it was deemed acceptable.
· Parking for the dwellings
would be allocated and there would be unallocated parking for visitors.
· All roads were designed to
the standards that Highways would require and would accommodate two cars
passing.
· The Wessex roundabout was outside
of the application site and it was not considered necessary to provide
improvements to the roundabout.
· Lower Putton Lane would
provide a key pedestrian link to the site and there was a small section of that
road without a footpath.
· A traffic-controlled
junction would allow children to access the school without having to cross the Wessex
roundabout.
· Permitted Development
rights would restrict raised garden platforms and balconies.
· Officers understood that
the school in Chickerell had been oversubscribed in the past, however in the
most recent year had not been oversubscribed.
· A management company would
maintain signage on site.
· Chickerell Town Council had
expressed interest in taking on maintenance of public areas and there would be
a fallback position to go to a management company.
· Drainage plans and flood
risk data did take into account future projections of rainfall.
· The school would only be
provided if there was the need for it and the site allocated for the school
couldn’t be used for any other use, unless a new application came forward.
· The application site falls
outside of the dark skies area and the Dorset National Landscape, so it was not
considered necessary to restrict lighting.
The committee agreed to extend the meeting beyond
three hours.
The meeting adjourned at 12:38 – 13:25
Cllr Northam returned to the Council Chamber at
13:27, as he was not present for the full debate he did not take part in the
rest of the deliberation of the application and left the Council Chamber at
13:31.
Several members raised concerns with the
application, in particular the lack of the provision of a health centre, as
they agreed with the Town Council that health provision in the area was
insufficient. However, officers explained that the NHS had not requested a
health centre be provided on the site and so it was difficult to condition and
the application would make financial contributions to the NHS.
It was proposed by Cllr Christopher and seconded by
Cllr Taylor that the application be delegated to officers in consultation with
the Chair to grant planning permission, with additional conditions requiring
heat pumps/air conditioning and fencing around the drainage basins, a local connection clause for the
affordable housing in the S106 agreement and subject to the amendments to two
conditions as per the committee update sheet.
Decision: That
A)
That authority be delegated to the Service Manager
for Development Management and Enforcement or the Development Management Area
Manager Southern and Western Team, in consultation with the Chair of the
committee, and subject to no new material planning objections being received to
the amended plans the current subject of consultation to grant planning
permission subject to conditions as set out in the appendix to these minutes
and the completion of a Section 106 Planning Obligation under Section106 of the
Town and Country Planning Act 1990 (S106 agreement) to secure the following:
·
No more than 100 dwellings to be occupied prior to the completion of the
central avenue;
·
Provision of 35% affordable housing;
·
Financial contribution of £722 per dwelling towards NHS;
·
Financial contribution of £524.72 per dwelling and £357.77 per flat
towards Chesil and the Fleet mitigation;
·
Financial contribution of £1,736.06 per qualifying dwelling (house or
flat with 2 or more bedrooms), less land value discount of £482,000, towards
primary education; plus a contribution towards SEND provision of £1,487.62 per
qualifying dwelling, together with the transfer of land for the school;
·
Financial contribution of £22,524 towards sports pitches and training
facilities;
·
Financial contribution of £106,413 towards Weymouth swimming pool;
· The
provision of 0.28ha of play space, which shall include two LAP’s, a LEAP, and informal
play, together with the transfer of the land to Chickerell Town Council and a
financial contribution of £411.84 per 2 bed unit; £587.34 per 3 bed unit;
and £669.24 per 4+ bed unit; less land value discount of £98,800 towards play provision; a financial contribution of
£420,000 towards maintenance, and to address the shortfall in play provision, a
financial contribution of £50,000 towards enhancing the play facilities at Willowbed Hall and/or towards a skate park within the town;
· Financial
contribution of £348,532.80 towards open space maintenance, together with
transfer of the land to Chickerell Town Council;
· Financial
contribution of £50,000 towards improvements to Willowbed
Hall;
· Financial
contribution of £81,675.76 towards bus infrastructure; sustainable travel
cards to be exchanged for 30 day bus ticket or cycle equipment; updating
the walking and cycling maps;
· Financial
contribution of £20,000 towards the upgrading of footpath S16/23;
·
Financial contribution of £12,000 towards the upgrading of footpath
S16/21.
B)
That planning permission be refused for the reasons set out in the
appendix to these minutes if the S106 agreement is not completed within 6
months from the committee resolution or such extended time as agreed by the
Corporate Director for Planning, the Service Manager for Development Management
and Enforcement or the Development Management Area Manage within 6 months from
the committee resolution.