Erection of up to 50 no. dwellings, including provision of public open space, drainage & ancillary works (outline application to determine access only).
Minutes:
The Lead Project Officer presented the application using
plans, aerial photographs and site images, and outlined the proposal and
relevant planning policies. Members were advised that the Council's October
2025 five-year housing land supply statement identified a significant
shortfall, confirming the Council can only demonstrate a deliverable
housing supply that is equivalent to 2.53 years supply.
The site was located approximately 1 km from the town centre
in a sustainable location with good access to services and facilities.
Landscape visualisations demonstrated that proposed planting and landscaping
would soften views of the development over time, resulting in limited visual
impact, including from the Trailway. Overall effects of the development on
receptors would be minor or moderate adverse rather than major adverse
(significant). The development would not adversely affect the Dorset National
Landscape.
Members were informed that flood risk was low and that the
proposed drainage strategy included attenuation basins and permeable paving
which had been accepted by the Lead Local Flood Authority. Foul drainage would
connect to the existing sewer on Manston Road via a pumping station on site.
There would be no harm to heritage assets. The scheme would provide two access
points with pedestrian crossing facilities and was not considered to raise
highway safety concerns. Although some habitat and hedgerow loss would occur,
the proposal would deliver biodiversity enhancements and net gain. The root
protection area of protected Black Poplar trees could be affected but
conditions could be imposed to determine the presence or absence of any tree
roots.The site
was not classified as best and most versatile agricultural land.
Members were advised that, in terms of the planning balance,
weighing against the proposal was the conflict with the spatial strategy,
however only limited weight could be given to this given the Council’s housing
land supply position. Weighing significantly in favour would be the provision
of 50 dwellings, including affordable housing, as well as public open space and
infrastructure contributions secured by legal agreement. Economic benefits
would also arise through construction activity and local spending.
The Lead Project Officer concluded that there were no
adverse impacts that would significantly and demonstrably outweigh the
benefits of the proposed development.
Public Participation
Public – Objection
Richard Nye
He explained to the Committee that he had lived on Manston
Road for approximately 25 years and raised concerns regarding the cumulative
impact of the proposed development on highway safety and the operation of
Manston Road. Particular concern was expressed regarding the proposed principal
access serving 50 dwellings. He highlighted that existing residential driveways
were located opposite the proposed junction, together with a footpath providing
access to the recreation ground.
Concerns were raised that vehicle movements associated with
the development, existing residential traffic, pedestrians and crossing points
would all be concentrated within a limited section of road and that residents
were unclear whether the combined impact of these movements had been fully
assessed.
He also raised concerns regarding the proposed secondary
access and pedestrian crossing opposite an entrance to the Rixon Recreation
Ground. Reference was made to highway safety measures previously introduced at
this location following a fatal accident in 1982, including pedestrian
railings, and it was suggested that the area had long been recognised as a
sensitive location for pedestrian safety.
Further concerns were expressed regarding visibility and
vehicle speeds on Manston Road, particularly for traffic approaching from
Shaftesbury and cresting the nearby hill. He questioned whether sufficient
assessment had been undertaken of the interaction between the proposed access
arrangements, pedestrian crossing points and existing turning movements. It was
noted that the applicant's traffic survey had recorded vehicle speeds above the
posted 30mph limit, with typical speeds of 36-37mph and some vehicles
travelling in excess of 50mph.
He also referred to an increase in the use of the road by
agricultural vehicles, lorries and HGVs and expressed concern that no detailed
assessment of vehicle types using the route had been undertaken.
In conclusion, he urged Members to consider whether the
highway impacts had been adequately assessed in the context of how the road
operates on a day-to-day basis and whether the proposed development was
appropriate in this location.
Laura Hitchcock (Speaking on behalf of Manston Road
Resident’s Association)
She advised that residents recognised the need for
additional housing within Dorset but questioned whether the application site
represented an appropriate location for development and whether sufficient
evidence existed to justify a different outcome from the Planning Inspector's
decision issued approximately 18 months earlier.
Reference was made to the officer's report, which identified
conflict with the development plan, landscape harm, the presence of two
nationally significant native Black Poplar trees, and drainage and groundwater
constraints. The objector accepted that these impacts had been identified and
argued that the key issue for Members was whether the benefits of the
development outweighed those harms.
She noted that proposals for housing on the site had been
dismissed on appeal in 1978, 1995 and more recently in 2024, on the basis that
development would harm the eastern edge of Sturminster Newton. It was argued
that the current scheme was materially similar to previously refused proposals,
comprising development on the same undeveloped hillside outside the settlement
boundary with similar access arrangements and layout. Whilst recognising the
proposed mitigation planting, the objector contended that landscaping could soften
views but could not fully mitigate the loss of the site's undeveloped
character.
She raised concerns regarding the proposed highway access
arrangements. She questioned whether sufficient assessment had been undertaken
of the cumulative interactions between the principal access, existing
residential driveways, pedestrian crossing facilities and routes to the
recreation ground. Further concern was expressed regarding the secondary
access, its proximity to a hill crest, and recorded vehicle speeds on Manston
Road.
In conclusion, she urged Members to consider whether any
material circumstances, other than the Council's housing land supply position,
had changed since the previous appeal decision and whether the evidence before
the Committee justified departing from previous planning decisions relating to
the site.
Courtenay Hitchcock
He advised that they recognised the need for additional
housing in Sturminster Newton and explained that a number of major housing
developments were already underway, with further growth proposed through both
the Neighbourhood Plan and the emerging Dorset Local Plan. However, concern was
expressed regarding whether the application site had been demonstrated to be
suitable for development.
Reference was made to the Council's assessment, which
identified the site as being affected by areas of high surface water flood risk
and the highest category of groundwater emergence.
He stated that the drainage strategy had evolved
significantly during the application process but that the understanding of
groundwater conditions continued to rely primarily on a groundwater
investigation undertaken during the summer of 2021. It was noted that the
previous Planning Inspector had acknowledged limitations in the available
groundwater evidence, and concern was expressed that no equivalent winter
groundwater monitoring had been undertaken. He questioned whether the site's
maximum groundwater levels were fully understood.
He also referred to the identification of two nationally
significant female native Black Poplar trees on the site, which had initially
been recorded as Poplar trees. It was noted that these rare trees were closely
associated with local hydrological conditions and were located adjacent to the
proposed sewage pumping station, access road and wider drainage infrastructure.
Concern was expressed regarding the potential long-term
implications of the development on the trees and their environment.
He suggested that the emergence of additional information
during the application process demonstrated that understanding of the site
continued to evolve. It was therefore questioned whether sufficient information
was available to conclude that the site was suitable for development in
principle.
In conclusion, he requested that Members carefully consider
whether there remained uncertainty regarding groundwater conditions and the
potential impacts on the native Black Poplar trees, and whether outline
planning permission could be granted with confidence in those circumstances.
Applicant/Agent
Alan Williams (Speaking on Behalf of the Applicant)
The agent acknowledged the concerns raised by local
residents and advised that these had been fully considered throughout the
determination of the application. Members were reminded that the application
must be assessed against the current planning policy position and the evidence
before the Committee.
It was noted that the Council could currently demonstrate a
2.53-year housing land supply and, as a consequence, the policies most
important to determining the application were considered out-of-date. The agent
advised that the presumption in favour of sustainable development was therefore
engaged.
The proposal would provide up to 50 dwellings, including 40%
affordable housing, together with public open space, biodiversity enhancements
and financial contributions towards local infrastructure. These were presented
as significant public benefits weighing in favour of the development.
Addressing technical matters, the agent stated that the
Highway Authority had assessed the proposal and raised no objections,
concluding that the residual highway impacts would not be severe. The Lead
Local Flood Authority and the Environment Agency were similarly satisfied that
flood risk and drainage matters could be addressed through planning conditions.
It was further noted that consultees responsible for ecology, trees and
residential amenity had raised no objections that would justify refusal.
In relation to landscape impacts, the agent acknowledged the
site's planning history and the previous appeal decision. However, it was
advised that the current application was supported by more detailed landscape
evidence, including an updated Landscape and Visual Impact Assessment. The
agent highlighted that the Council's Landscape Officer had concluded that,
whilst the development would alter the existing settlement edge, the effects
were not significant enough to warrant objection and could be appropriately
mitigated through landscaping.
Members were reminded that the application was submitted in
outline form, with all matters except access reserved for future consideration,
allowing further scrutiny of the detailed design through a subsequent Reserved
Matters application.
In conclusion, the agent stated that the adverse impacts
identified did not significantly and demonstrably outweigh the benefits of the
proposal, particularly in the context of the Council's housing land supply
shortfall and therefore supported the officer recommendation for approval.
Parish/Town Council Rep
Cllr Andrew Donaldson (Sturminster Newton Town Council)
Cllr Donaldson addressed the Committee on behalf of
Sturminster Newton Town Council. He questioned what material changes had
occurred since the previous application was considered approximately two years
ago and stated that he had seen no evidence to suggest the current proposal was
materially different or more acceptable than the earlier scheme.
He acknowledged that the Committee's consideration related
specifically to the proposed site access; however, he noted that approval of
the access would, in effect, facilitate the wider development of the site. He
advised that numerous objections had been submitted and confirmed that the Town
Council supported the concerns raised by objectors.
Cllr Donaldson highlighted highway safety concerns,
particularly in relation to traffic approaching from the north. He referred to
a history of pedestrian fatalities in the area and expressed the view that the
proposal would do nothing to reduce or mitigate existing risks.
Referring to the Sturminster Newton Neighbourhood Plan,
which remains in force until 2030, he drew attention to the policy statement
that “land east of Manston Road is considered unsustainable for further
development, particularly because of the topography, making it difficult for
landscaping to soften the visual impact of building in the extensive wider
views.” He submitted that the landscaping and mitigation measures proposed as
part of the application were insufficient to address the visual impact of the
development.
Cllr Donaldson stated that he could see no justification for
granting the application, particularly in light of the previous refusal.
Officers responded to the comments raised by the speakers
as follows:
Members' questions and comments
Officers provided the following responses to Members'
questions:
The Committee was adjourned from 12:12 - 12:23.
Having had the opportunity to discuss the merits of the
application and an understanding of all this entailed; having considered the
officer’s report and presentation; the written representatives; and what they
had heard at the meeting, a motion to REFUSE the officer’s
recommendation to GRANT planning permission as recommended, was proposed
by Cllr Jespersen, and seconded by Cllr Jones.
Decision: To refuse planning permission for the
reasons set out in the appendix to these minutes.
Break: 12:28 -13:00.
Supporting documents: