Erection of 19no. dwellings & amenity space with access from Lower Street.
Minutes:
With the aid of a visual presentation, including site
location plans, aerial photographs, proposed layouts and site photographs, the
Case Officer identified the application site and outlined the proposed
development, relevant planning history, and applicable planning policies.
Members were advised that housing targets had increased
significantly since the previous appeal decision and that the site, although
outside the settlement boundary, was considered to be
in a sustainable location.
The site forms Phase 2 of a wider development, with Phase 1
already approved and under construction. Previous appeal concerns relating to
layout, pedestrian safety, parking arrangements and the attenuation pond had
been addressed through revisions to the scheme, including a dedicated footway,
amended parking layout and clearer drainage proposals.
Members were advised that the development would provide a
mix of affordable and market housing, with design and scale reflecting local
character. Officers considered that impacts on the National Landscape, heritage
assets and the Conservation Area would be limited.
Ecological enhancements, including biodiversity net gain,
landscape planting, hedgerow translocation, bat and bird features, were
proposed. The site lies within Flood Zone 1, with a low risk of flooding, and
the dwellings would incorporate air source heat pumps.
The Case Officer concluded that the concerns raised in
relation to the previous scheme had been satisfactorily addressed and
recommended approval, subject to conditions.
Public Participation
Public Objection
Cllr George Norris did not attend the meeting.
Applicant/Agent
Matthew Holmes (Agent)
Mr Holmes advised that the application had been submitted
following previous applications and that the plans had been amended during the course of the application in response to feedback
received. He welcomed the officer recommendation for approval and stated that
the scheme had been carefully designed to fit with the character of the area.
He explained that the proposed buildings were of a
traditional design and provided a mix of dwelling sizes. Landscaping was
proposed for the front and rear gardens together with an area of green space on
the western edge of the site. The scheme had also been designed to take account
of the site's biodiversity interests.
Mr Holmes stated that the relevant Council policy criteria
had been considered throughout the design process. All dwellings would meet or
exceed the minimum national space standards and would benefit from
appropriately sized rear gardens. He added that the proposed density of
development was comparable to that of surrounding properties.
Reference was made to the officer’s report, which concluded
that the proposals were acceptable in terms of design and visual impact and
would provide a suitable living environment for future residents. He further
noted that the proposed dwellings were appropriately separated from
neighbouring properties and that the relationship between existing and proposed
homes had been carefully planned.
Mr Holmes reminded Members that the proposal was unchanged
from the previous application that had been determined at appeal. He stated
that the appeal decision had confirmed that the development was acceptable in
terms of design, heritage and drainage considerations and that the site
represented an appropriate location for new housing. He explained that the
previous appeal had been dismissed for two specific reasons: the mix of affordable
housing units and housing supply matters.
He advised that both issues had now been addressed. The
affordable housing mix had been amended to meet the relevant requirements and
housing supply calculations had changed since the appeal decision. As Dorset
was now experiencing a housing land supply shortfall, the proposal would assist
in meeting identified housing needs.
In conclusion, Mr Holmes considered the proposal to be a
well-designed residential development that was appropriate to its context and
capable of delivering much-needed housing on a site that was suitable for
residential development by virtue of its location and the characteristics of
the surrounding area.
Parish Council
Cllr Rachael Rowe (Speak on behalf of Okeford Fitzpaine
Parish Council)
Cllr Rowe acknowledged that the proposed development
contained some interesting design features; however, she advised that the
Parish Council remained opposed to the scheme.
She informed Members that, when the Parish Council had last
considered the site, Phase One of the development had been suspended due to
instability in construction costs. As a result, she questioned when the
proposed homes would be delivered, despite the acknowledged need for additional
housing within Dorset.
Cllr Rowe stated that the development would extend beyond
the settlement boundary of Okeford Fitzpaine and would therefore result in
development within the open countryside. She expressed concerns regarding the
impact on wildlife and suggested that approval could set a precedent for
further development outside the settlement boundary.
Concerns were also raised in relation to highway safety.
Cllr Rowe advised that access to the development would be via Lower Street and
that the Parish Council remained concerned about visibility at the junction
with Play Close. She explained that vehicles parked outside existing properties
could restrict sightlines, particularly during busy periods. Additional
concerns were raised regarding the proximity of the village play area, with
fears that children may not be readily visible to drivers because of limited
visibility from the junction.
She further noted that Lower Street was not routinely
gritted during winter conditions and considered that the cumulative impact of
traffic generated by this and other developments in the village would
exacerbate existing highway issues. Parking pressures within the village centre
were also highlighted, with vehicles frequently parked on local streets, which
in turn could further affect visibility and road safety.
Cllr Rowe advised that the site was located away from the
main transport corridor and was therefore less well connected to facilities and
services. Public transport provision within the village was described as
limited, and no plans had been identified to increase services to meet the
demands arising from additional housing development.
The Parish Council also expressed concern that, despite
continued housing growth, local infrastructure had deteriorated. Reference was
made to the loss of significant employment opportunities in the area, the
closure of the village primary school in 2023, and the resulting absence of
pre-school and childcare provision. Cllr Rowe also referred to the loss of the
visiting GP service, inadequate or poor-quality pavement infrastructure
restricting access for wheelchair users, ageing electricity infrastructure
resulting in frequent power outages, and limited public transport services.
Members questions and comments
In response to Members’ questions, officers provided
clarification on a number of matters relating to the
proposed development:
Having had the opportunity to discuss the merits of the
application and an understanding of all this entailed; having considered the
officer’s report and presentation; the written representatives; and what they
had heard at the meeting, a motion to APPROVE the officer’s
recommendation to GRANT planning permission as recommended, was proposed
by Cllr Ridout, and seconded by Cllr Brenton.
Decision: To grant planning permission subject to the
conditions set out in the appendix to these minutes.