Erection of an extension to the existing industrial unit and canopy to infill the remaining frontage. Reformatting and formalising the existing outdoor hardstanding to the frontage of the site.
Minutes:
The
Development Management Team Leader presented the application for the erection
of an extension to the existing industrial unit, together with a canopy to
infill the remaining frontage and the reformatting and formalisation of the
existing outdoor hardstanding area at the front of the site. It was noted that
the application had come to committee for determination because it was situated
on Dorset Council owned land.
An
aerial photograph was shown identifying the application site. Members were advised
that the site comprised a large courtyard and parking area contained within its
own compound, with Avon Close located to the south and Chickerell Link Road to
the north.
Existing
elevations of the building were displayed, followed by the proposed block plan.
The proposed extension would project from the south-eastern side of the
building and would provide an additional 339 square metres of Class B8 storage
and distribution floorspace. The plans also included a new canopy, a pedestrian
and cycle access, and a disabled parking space. Proposed elevations were shown
and it was explained that the extension had been designed to match the scale,
appearance and materials of the existing building.
Photographs
of the site and access road were shown. It was noted that storage was currently
taking place within areas of the site that could be used for parking. It was
explained that approximately 30 parking spaces could currently be accommodated
within the site, but following the formal remodelling of the courtyard, 19
spaces would remain available.
A
trip assessment had been undertaken to analyse the operational needs of the
business. This indicated that the maximum number of vehicles typically present
on the site at any one time was around ten. The proposal was considered to
represent a visual improvement to the site and was expected to generate only limited
vehicle movements, with approximately 11 visits a day. No objections had been
raised by the Highway Authority.
The
Development Management Team Leader outlined the key planning considerations,
which included the principle of development, visual amenity, flood risk and
highway safety. The principle of the development was considered acceptable, and
it was concluded that the proposal would not have an unacceptable impact on visual
amenity. Flood risk impacts were also considered acceptable and would not be
unduly increased as a result of the development.
In
relation to highway safety, a third-party representation had raised concerns
regarding parking and vehicle movements. The Highway Authority had acknowledged
that operational demands could vary significantly between businesses and had
exercised judgement when assessing the proposal. The submitted trip assessment
was considered to provide a reasonable reflection of current site operations
and, whilst tending towards the lower end of anticipated vehicle movements, was
regarded as realistic for a development of this nature.
Reference
was made to Dorset parking standards, which indicated that a Class B8 use of
this size would require only two parking spaces. It was advised that parking
provision would be more marginal if the building were to be used for general industrial
purposes; however, a planning condition was proposed restricting the use of the
extension to Class B8 storage and distribution only.
In
response to questions from members the Development Management Team Leader provided
the following responses:
·
The application included cycle spaces that would allow the site to be
connected to the cycle network as identified in the transport assessment.
·
A business couldn’t be prevented from using available on-street parking, however it was considered that parking within the
site was sufficient to serve the business needs.
It
was proposed by Cllr Wheller and seconded by Cllr Christopher that the
application be granted as per the officer’s recommendation.
Decision:
That the application be granted subject to the conditions set out in the
appendix to these minutes.