P/FUL/2026/02367 - Littlemoor Youth Centre, Louviers Road, Weymouth, DT3 6AY

Insert new doors and windows; erect external canopy; install 2m high enclosure; install air-source heat pumps; and install new path.

Minutes:

Cllr Peter Dickenson left the meeting at 10:59.

 

The Senior Planning Officer presented the application for the insertion of new doors and windows, the erection of external canopies, the installation of a 2-metre-high enclosure, the installation of air source heat pumps, and the construction of a new path. It was noted that Dorset Council was both the applicant and the landowner.

 

The site was identified on an aerial photograph and was described as being located outside the Defined Development Boundary in the open countryside. Access to the site was already established from Louviers Road. Residential properties were located to the north of the site, and the existing use of the building was well established.

 

Details of the proposed development were presented. These included the insertion of new doors and windows, the erection of a 2-metre-high mesh fence at the rear of the site, and the construction of an 85-centimetre-high gabion wall along the eastern boundary. It was explained that the gabion wall fell outside the application red line and was considered permitted development. Two entrance canopies were proposed, together with a new path on the western side of the site. Provision was also shown for 12 cycle parking spaces and three air source heat pumps. Members were advised that the enclosures, path and cycle hoops were all considered permitted development.

 

Existing and proposed elevations were shown, along with details of a photovoltaic solar array, which it was explained had been omitted from the drawings in error. The positions of the three air source heat pumps were also identified.

 

Photographs of the building and its surroundings were displayed, including views of the rear of the building showing the proximity of existing vegetation and views from Lorton Valley.

 

It was advised that, although the site was located outside the Defined Development Boundary, the proposal was considered acceptable under Policy SUS2 of the Local Plan and paragraph S5 of the National Planning Policy Framework. It was explained that Policy S5 supported development unless the adverse impacts significantly and demonstrably outweighed the benefits. Reference was also made to Policies COM2 of the Local Plan and W52 of the Neighbourhood Plan, which sought to protect community facilities. Relevant policies relating to renewable energy had also been considered, and no policy conflict or harm had been identified.

 

In terms of visual impact, it was advised that no concerns had been raised. The Highway Authority had not objected to the proposal, although it had noted that one of the cycle hoops appeared to be positioned too close to the building. No amended plans had been sought as the cycle hoops did not require planning permission and were not considered essential to the assessment of the application. No vegetation loss was proposed, and the Natural Environment Team had raised no objections. Biodiversity Net Gain requirements were not applicable as the proposal did not meet the relevant threshold.

 

It was concluded that no adverse effects had been identified. The benefits of the proposal included improvements to an existing community facility and the provision of renewable energy infrastructure, both of which were considered significant benefits.

 

In response to members questions the Planning Officer provided the following responses:

·       Environmental Health had raised no concerns with the location of the air source heat pumps and the 68m separation distance, combined with the building acting as a barrier to sound was considered sufficient to ensure that there would be no adverse impact on neighbours.

·       If the air source heat pumps were to be replaced they would be required to be of the same noise level.

·       Carbon saving benefits were a material consideration but there was no requirement in the NPPF to quantify those benefits or to demonstrate the need for renewables.

 

It was proposed by Cllr Christopher and seconded by Cllr Bawden, that the application be granted in line with the officer’s recommendation.

 

Decision: That the application be granted subject to the conditions set out in the appendix to these minutes.