Issue - decisions

Openreach 25 July 2023 between 0800 and 1700 – TOLLER LANE, TOLLER PORCORUM between the sewage works and a point approximately 650 metres east.

11/07/2023 - Openreach 25 July 2023 between 0800 and 1700 – TOLLER LANE, TOLLER PORCORUM between the sewage works and a point approximately 650 metres east.

Approved to enable Openreach safe access to carry out pole recovery works.